How to take an apartment in a new building without finishing

How to take an apartment in a new building without finishing



Buying an apartment in a newly built house is excellentthe opportunity to purchase new housing at an affordable price, the difference in the cost of an apartment bought at the beginning of construction, and in a house put into operation can be up to 50%. Therefore, many new settlers have to take an apartment in a new building without finishing. But in this case there are requirements that you can show the developer.





How to take an apartment in a new building without finishing

















What to look for when taking an apartment without finishing

To receive an apartment in a new building, come today time, taking with him a tape measure, a plumb line and a level. Although you, as they say, take "bare walls", but this does not mean that these walls should be curved, and inter-panel seams - leaky. Check the dimensions of the rooms and the height of the ceilings specified in the project documentation with the actual one. In the event that the area of ​​the apartment is less than that indicated in the contract, you have the right to demand compensation. Check the horizontality of the floor with a level, and the verticality of the walls - with a plumb. If the house is brick, knock out the walls - there should be no voids in them. On walls and ceilings there should be no traces of mold and fungus. Check how the windows and doors are installed, how tightly they are closed, whether it does not blow in the gap, including between the window and the wall. This can be done easily with a lighted candle or lighters. Joints, seams and the space between walls and frames should be insulated and hermetically sealed. Inspect each window and door, check how they function in different positions, whether all the necessary fittings are in place. If the balcony is glazed, pay special attention to the quality of the double-glazed units installed on it.
Unfortunately, if the construction work wasrecently, and the walls and ceilings have not dried out, and in the case when there is still no heating, the condensation on the windows may well be, even if they are installed without disrupting the technology.
Inspect the radiators fortheir type indicated in the documents, they are securely attached. In the bathroom, check that the hood is working by raising the lighter to it. Inspect all doors and hatches, check how securely they close. Check the wiring for hot and cold water, if there are connections for the sewage system, a washing machine.
You can sign the act of transfer and reception of the apartment with the application of a defective sheet, in which the terms for elimination of deficiencies will be indicated. Just in case, illustrate them with the attached photos.

If identified shortcomings

If you have a well-founded claim torented apartment, do not sign the act of acceptance, even if the customer swears that everything will be fixed tomorrow. Make a list of claims and present it to the developer. In the event that you have invested money in construction under an equity agreement, the law is on your side-you should eliminate the shortcomings you have identified, or refund the cost of the alteration if you do it yourself.