How to plan repair correctly

How to plan repair correctly



Almost every family, sooner or lateris faced with the fact that an apartment or a house needs to be repaired. Unfortunately, repair is a pleasure not cheap, and that it left as it is possible more favorable, it is necessary to plan all in advance.





How to plan repair correctly

















First of all, it is necessary to determine how muchglobal will be repair. In some cases, it is quite possible to do with a light cosmetic option, which will significantly save the budget. Next, you need to compile a complete list of required materials with their approximate cost. It is best for each room to make your own list - this will allow you to plan the repair step-by-step and eliminate the need to buy all the materials at once.

Once the lists are ready, and the calculationsare made, it is necessary to begin preparatory work. First of all, you need to take care that during the repair in the house there were neither children nor animals. They can be sent to visit grandmothers with grandfathers or other close relatives. From the room to be repaired, you need to move all the furniture, that is, the room should be completely free. If this is not possible, then the furniture should be insulated with a special building film. And all the outlets and switches need to be sealed with a paint tape. Only after this, you can proceed with immediate repair.

Begin it always follows from the very farthest premise and gradually move to the entrance door. So there is no risk of dirtying or spoiling the repairs just made in any room.

At the very outset, the mostdirty and laborious work. These include the dismantling tasks that are associated with the redevelopment of the room, the replacement of wall, floor or ceiling materials, replacement of windows, etc. Then comes the period of leveling the floor, walls and ceiling. As a rule, this is necessary in almost every case. In addition, this procedure allows you to keep the repair in good condition for much longer.

Further, if necessary, replaceheating and sewerage systems, as well as wiring. This stage is very important for further comfortable living in the room, so you can not ignore it. Next comes the stage of rough work. This is the leveling of walls with special plaster mixtures, applying the final layer. When the ceiling and walls are leveled, it is necessary to apply an antifungal primer.

And finally, it is the turn of the finishing works. In particular, this is a replacement of doors, wallpapering, ceiling finishing, as well as all the other small things that form the final design of the room.

It is understood that the material costs directlydepend on the number and complexity of the planned work, as well as on the options for their implementation. For example, the cost of repair, implemented by a special organization, is much higher than the independent transformation. And not always the result of labor of hired workers correlates with the required payment. Therefore, if it is possible to do something on its own and in good quality, it is better not to ignore this point.